W Residences Marina View Completion Dates
The developer expects to give vacant possession of the homes at W Residences Marina View by 31 March 2029 and expects legal completion by 31 March 2032. Construction is under way, with Woh Hup as the main contractor, and the dates that bind each purchase are those in its sale and purchase agreement.
Those two dates frame the payment schedule too. Under the progressive payment scheme a quarter of the price falls due at the Temporary Occupation Permit and the final 15% at the Certificate of Statutory Completion, so the last instalments follow the building’s own certificates.
From Land to Launch at W Residences Marina View
The site’s 99-year lease began on 27 December 2021, on Lots 483K and 484N of Town Subdivision 30 with a subterranean space lot beneath them. IOI Properties Group secured the white site at Marina View in 2021, and the approved plans put a hotel on the lower levels of one tower with the homes above.
The first building plan approval, A1252-00566-2022-BP01, is dated 23 January 2024, and the sixth, BP06, 10 May 2025. The developer issued its brochure and marketing began in June 2025, a private preview for invited buyers followed in July 2025, and the public launch came on 25 October 2025, with a first phase of 100 homes on levels 16 to 20: 85 of one to three bedrooms and 15 of the Signature Collection.
| Date | Milestone |
|---|---|
| 27 Dec 2021 | The 99-year lease begins |
| 23 Jan 2024 | First building plan approval (BP01) |
| 10 May 2025 | Sixth building plan approval (BP06) |
| Jun 2025 | Brochure issued; marketing begins |
| Jul 2025 | Private preview for invited buyers |
| 25 Oct 2025 | Public launch; first phase of 100 homes on levels 16 to 20 |
| 12 Jul 2026 | Prince Edward Road station opens nearby |
| 31 Mar 2029 | Expected vacant possession |
| 31 Mar 2032 | Expected legal completion |
Sources: the developer’s brochure and Annex B3 plans; The Business Times and EdgeProp, 2025; the Land Transport Authority.
What Has Changed Around W Residences Marina View
The neighbourhood has moved on while the tower rises. Prince Edward Road station, about 450 metres from the site in a straight line, opened on 12 July 2026 with Stage 6 of the Circle Line, which closed the loop between HarbourFront and Marina Bay, according to the Land Transport Authority.
The developer’s brochure also maps the coming expansion of Marina Bay Sands and The Commons recreation hub, which the sales-kit map places about eight minutes on foot from the site. The brochure describes the expansion as including a 15,000-seat arena with new facilities for events and tourism, and The Commons as an 18-hectare recreational hub with greenery and open spaces for community events.
Building W Residences Marina View Stage by Stage
Buyers pay as the tower is built. The Housing Developers Rules fix the stages, from the completion of the foundation and the reinforced concrete framework through the partition walls, the roofing and ceiling, the doors, windows, wiring and plumbing, and the car park, roads and drains, up to the Temporary Occupation Permit and the Certificate of Statutory Completion.
As each stage is certified, the developer issues a notice and the bank pays that instalment. A home booked after some stages are certified carries those instalments from the outset, on the timetable in its sale and purchase agreement, and the Sales Concierge confirms which stages have been reached at the time of booking. The payment scheme page lists every stage with its share of the price.
The Team Building W Residences Marina View
Architects 61, a Singapore practice of more than 50 years whose work has shaped much of the Marina Bay skyline, designed the tower as three slender volumes of pale glass and aluminium, with vertical fins that climb to a stepped crown. Hachem designs the interiors of both the hotel and the residences, and Woh Hup, with more than 97 years in Singapore construction and civil engineering, is building the tower.
The building is certified BCA Green Mark Platinum, and the residences will be managed by Marriott International, integrated with the W hotel on levels 1 to 14. The developer page introduces Boulevard Development Pte. Ltd. of IOI Properties Group, which holds housing developer’s licence C1466 with Boulevard Midtown Pte. Ltd.
What Comes Next at W Residences Marina View
The latest updates page records each step as it happens. The next entries to expect are the construction milestones under the payment scheme on the way to vacant possession, updated counts on the balance units chart as sales continue, and the opening of the W Singapore – Marina View hotel on the levels below the residences.
Any change to stamp duty or to the loan limits will be reflected on the financing pages. Meanwhile the project details page keeps every confirmed particular in one table, and the price list with the homes still available is sent by the Sales Concierge on request. Showflat viewings are arranged by appointment through the Sales Concierge.
This article is general information as at the date shown and is not financial, legal or tax advice. Particulars of W Residences Marina View are from the developer’s published documents, statutory figures are as set out on this site’s financing pages, and distances are straight-line measurements or the travel times on the location map in the sales kit. Sources: the developer’s brochure and Annex B3 plans, The Business Times and EdgeProp (2025) and the Land Transport Authority, as set out on this site’s latest updates and project details pages.